Project Description
Contractor | Phoenix Medical Construction
Construction Cost | $2.7 Million
Completion Date | December 2015
The goal of the project was to create a 6,900 square foot state-of-the-art Interventional Radiology and Cath Lab Suite, consisting of two large lab spaces, which can each accommodate both Cath and IR functions, with a shared control area between the labs. A procedure room was created adjacent to a 6-bay Prep and Recovery area, which includes an Isolation Room, as well as additional support spaces. The IR/Cath Labs utilize Siemens' Artis Q Ceiling equipment.